Together with Heylen Warehouses, we have realized a large-scale warehouse (“Depot II”) and associated solar panel installation at SHIPP 21 in Puttershoek (Municipality of Hoeksche Waard).
Heylen Warehouses was responsible for the construction of the building.
👉 Heylen Energy provided it with renewable energy: solar panels and EV charging stations.
Some impressive numbers:
Warehouse, mezzanine, and office: 109,000 m²
🔹 Work surface: 91,000 m²
🔹 Installed solar panels: 20,051
Total solar panel capacity: 14.236 kWp
🔹 Number of EV charging points for cars: 38
Good to know:
The installation of the solar roof is structured through a long-term PPA, which makes the setup both ecologically and economically sound.
Everything is fully leased to one leading player in the fashion industry.